Photos

Keyword: Category: Tag: Sort By:
Crew chiefs and aircraft specialists in the 352nd Maintenance Squadron, Helicopter Maintenance Unit, remove rotor blades from one of the five MH-53M Pave Low IV Helicopters assigned to the 21st Special Operations Squadron, RAF Mildenhall, England, Oct. 02, 2007. Once the tear down process is complete, it usually takes an average two days; the helicopters will be transported to the Aerospace Maintenance and Regeneration Group in Tucson, Ariz., commonly known as the 'Boneyard.' All Pave Low helicopters in the Air Force inventory are due to be grounded by October 2008. (U.S. Air Force photo by Tech. Sgt. Tracy L. DeMarco)


First bolt

Crew chiefs and aircraft specialists in the 352nd Maintenance Squadron, Helicopter Maintenance Unit, remove rotor blades from one of the five MH-53M Pave Low IV Helicopters assigned to the 21st Special Operations Squadron, RAF Mildenhall, England, Oct. 02, 2007. Once the tear down process is complete, it usually takes an average two days; the helicopters will be transported to the Aerospace Maintenance and Regeneration Group in Tucson, Ariz., commonly known as the 'Boneyard.' All Pave Low helicopters in the Air Force inventory are due to be grounded by October 2008. (U.S. Air Force photo by Tech. Sgt. Tracy L. DeMarco)

Related Imagery
Tech. Sgt. Tracy L. DeMarco
071002-F-3231D-006.JPG

DOWNLOAD PHOTO
(1.74 MB MB)



Tags




< Back to Main Gallery