Photos

Keyword: Category: Tag: Sort By:
Contractors lay cement using an excavator, as part of the runway extension Oct. 5, 2012, at RAF Mildenhall, England. The pavement-quality concrete is laid to a thickness of 380 millimeters. Once dried, a saw is used to cut lines in the concrete, before being filled with a special sealant which allows it to expand and contract, to avoid cracking. (U.S. Air Force photo by Karen Abeyasekere/Released)


Construction for runway extension underway

Contractors lay cement using an excavator, as part of the runway extension Oct. 5, 2012, at RAF Mildenhall, England. The pavement-quality concrete is laid to a thickness of 380 millimeters. Once dried, a saw is used to cut lines in the concrete, before being filled with a special sealant which allows it to expand and contract, to avoid cracking. (U.S. Air Force photo by Karen Abeyasekere/Released)

Related Imagery
Karen AbeyasekereReleased
121005-F-EJ686-028.JPG

DOWNLOAD PHOTO
(0.86 MB MB)



Tags
people



< Back to Main Gallery